Intake stageAutomill module

Feed-mill weighbridge management

Get the first record right and every record after it inherits the accuracy. Vehicle, mass and load captured once at the bridge.

Capture it loosely here, and it stays loose.

The first record in the mill is made at the bridge. When the ticket, the vehicle and the load are captured loosely, every record after intake inherits the gap.

A plain white bulk feed tanker truck standing on a steel weighbridge plate beneath a covered loading spout, with silos behind

Identify the vehicle, link the order, issue the card.

  1. Identify the vehicle with the licence-disc reader and capture client, supplier and product info
  2. Link the transaction to its purchase order, contract or sales order, selecting or importing to cut data-entry errors
  3. Issue an RFID card linking the transaction to intake and the quality lab, with destination selection to prevent contamination

Operator experience

The current intake event, and where it is going.

Operators need clear prompts and a visible status for the current intake event, including the destination selected to prevent cross-contamination.

Where the record goes next

The first record, handed to everything downstream.

Fields, devices and procedure are confirmed on site. Final field, device and procedure requirements are confirmed against the existing plant before implementation.

Bring us a weighbridge ticket. We'll show you the first record done right.

Call us 011 792 8558

Thank you. Your enquiry has been sent.

The Automill team has your message.

A short confirmation email is sent to the address you gave. If it does not arrive, your enquiry has still reached us.

If it is urgent, call 011 792 8558.